¡Nuevo: 50+ centros de preparación añadidos esta semana!Explorar servicios
Este artículo aún no se ha traducido — mostrando la versión en EN.

Receive-to-Putaway: The 90-Minute SLA

Throughput math behind a fast prep center.

Throughput math behind a fast prep center.

Why this matters

Operations teams keep rediscovering the same lessons. This post lays out the patterns that actually move the needle on receive-to-putaway: the 90-minute sla.

The core idea

Throughput, not headcount, is the lever. Measure cycle time at every step and the bottleneck reveals itself.

A practical example

A 12-person prep center in Memphis cut receive-to-putaway from 4 hours to 90 minutes by changing two things — neither of them software.